JPS Casey Builders Freshwater Project Framing

post image

The project is now speeding up and we are achieving the required goals we need to each week.

The entire structure is now in place which includes 3 floors- 2 being concrete slab and the 3rd being timber joists.

All Wall framing is now complete also and the roof structure is now being installed. This is rafters being pitched off predominantly a steel skeleton to achieve the spans we needed to eliminate the need for internal walls.

Windows are now being install and the external cladding will follow.

Read the rest of entry »

JPS Casey Builders Freshwater Project Ground Floor

post image

Now that the Crane is on site the Ground floor formwork is now starting, using the crane to lift all timbers and steel up will 1/2 the construction time than using just manpower.

The ground floor slab will be on ground and also suspended due to the steep block, it will sit on and be held up with up to 16 300mm diameter concrete coloums.

Read the rest of entry »