The Freshwater project is on an extremely steep block which has required extensive planning and safety procedures to ensure the job can be completed successfully.
The excavation stage was a very delicate process and involved monitoring from geotech and engineers all the way through, this was to ensure that the stability of the site remained safe and that the excavation could be done in the correct way.