Collaroy Project

JPS Casey Builders Collaroy Project is nearing completion. The weatherboarding has changed the whole look of the building and the two new Gable end roofs off the front have really made the overall appearance house more modern.

Current Projects

Currently JPS Casey Builders are working on Projects in Collaroy, Manly and Narrabeen. The Collaroy project entails a roof extension and re cladding of the entire Two story home. The cladding type is from Hardies  see link -      &nb...

JPS Casey Builders Fitout Yoga 213 Studio

Once our Freshwater project was complete we moved straight on to a new yoga studio in Bondi. We had 9 Days to complete the project which was an empty shell and need new ceilings, floorboards walls and furniture. The design was using recycled materials a...

JPS Casey Builders Freshwater Project Fitout.

Over the pass couple of months since the last update we have finished off all tiling and fixout on the site. The design involved a flush skirting boards and set shadow line architraves which gave a modern look the internal finish. The external steel sta...

Popular tags:

Freshwater Project- Lock up

Its been a while since our last blog , but things have been very busy at our site, We have now completed the weatherboards and achieved lock up for the building. We have now moved on to the waterproofing in all bathrooms and decks. We use the product ca...

JPS Casey Builders Freshwater Project Ground Floor

Now that the Crane is on site the Ground floor formwork is now starting, using the crane to lift all timbers and steel up will 1/2 the construction time than using just manpower. The ground floor slab will be on ground and also suspended due to the steep...

JPS Casey Builders Freshwater Project- Crane installation

The mezzanine in the garage has been poured and the crane has been installed on site. The crane is a Self erect style crane that is approx 25 meters high and a jib length of 22 meters  and is driven by a remote control by the operator. JP&S Cas...

JPS Casey Builders Freshwater Project Footings and Dincel Wall

The first stage of construction has began with the footings for the garage walls being poured.  The Dincel wall system has been used as the garage walls as an alternative to the standard block work construction. Dincel is a PVC  interlocking sys...

JPS Casey Builders Freshwater Project ( Rock excavation)

After Months of excavation due to the site being so steep the excavation is complete. The nature of the job made the excavation process start from the top and work our way down the hill which meant no building could commence till the excavation was comple...

JPS Casey Builders Freshwater Project -Rock Excavation

The freshwater projects excavation consisted of an extreme amount of rock sawing and hammering as the proposed building is to be built into the existing  sandstone on the block. This process is time consuming but is essential in ensuring safety to th...