Freshwater Project- Lock up

Its been a while since our last blog , but things have been very busy at our site, We have now completed the weatherboards and achieved lock up for the building. We have now moved on to the waterproofing in all bathrooms and decks. We use the product ca...

JPS Casey Builders Freshwater Project Ground Floor

Now that the Crane is on site the Ground floor formwork is now starting, using the crane to lift all timbers and steel up will 1/2 the construction time than using just manpower. The ground floor slab will be on ground and also suspended due to the steep...

JPS Casey Builders Freshwater Project- Crane installation

The mezzanine in the garage has been poured and the crane has been installed on site. The crane is a Self erect style crane that is approx 25 meters high and a jib length of 22 meters  and is driven by a remote control by the operator. JP&S Cas...

JPS Casey Builders Freshwater Project Footings and Dincel Wall

The first stage of construction has began with the footings for the garage walls being poured.  The Dincel wall system has been used as the garage walls as an alternative to the standard block work construction. Dincel is a PVC  interlocking sys...